1. Confirm Calibration Gas Information

    Please confirm the following calibration gas details are correct.

    The above details will be included on the calibration certificate.
  2. Confirm Calibration Gas Status

    Please confirm that the calibration gas supplies are connected and pre-purged.

    • Gas 9 Gas Z Gas A
    • unknown unknown
    The above details will be included on the calibration certificate.
  3. Confirm Connected PurgEye Details

    Please confirm the below details match those of the connected PurgEye monitor before you proceed.

    • Not connected
    • unknown
    • unknown
    • unknown
  4. Calibration Point

    Automated calibation procedure in progress, please wait...

    • unknown
  5. Complete

    The Calibration process is now complete.

Device Authentication link
PurgEye model information
Submit Diagnostics Data to Technical Support

    PurgLog 2026 - Weld Report

    Job Information

    Logging Information

    PurgEye Details

    Detailed device diagnostics data for technical support.

      User Information

      Gasious Oxygen

      Dewpoint/Moisture

      Equivalent Total Oxygen
      Click here for more information on understanding oxygen monitor readouts of “Total O2” or “Equivalent O2” when combined with dew-point sensing.

      PurgEye Monitor Connected

      PurgEye Calibration

      12/12/2045

      PurgEye Firmware Update

      A newer firmware version is availible for the connected purge monitor

      234567

      234567

      Gas Control Valves;

      V1: Gas A
      V2: Gas 9
      V3: Gas Z
      V4: Vent
      V5: Pump
      V6: Proportional Enable

      Pressure Control PID Settings;

      Setpoint
      P Gain
      I Gain
      D Gain
      I Limit

      Pressure Control PID Status;

      Output Pressure
      Output Control Value
      Debug